Turbine flowmeter installation precautions

Time: 2020-02-20 12:02:50 Click:0
Turbine flowmeter installation precautions is following:

(1) Installation site
The turbine flowmeter sensor should be installed in a place where maintenance is easy, and the pipeline is free from vibration, strong magnetic interference and heat radiation. When installed outdoors, there should be measures to avoid direct sunlight and rain.
(2) Installation requirements and precautions
The sensor installed horizontally of the turbine flowmeter requires that the pipeline should have no observable tilt (within 5 deg;). The vertical deviation of the sensor installed vertically should be less than 5 deg;, and the fluid direction should be downward and upward.
Where the flow cannot be stopped, bypass and stop valves should be installed.
If the fluid contains impurities, a filter should be installed on the upstream side; if it contains gas, a deaerator should be installed on the upstream side. The drain and air outlet of the filter and the air cleaner should lead to a safe place.
The flow regulating valve should be installed downstream of the sensor, and the upstream shut-off valve should be fully opened during measurement, and must not cause vibration and external leakage. For processes that may produce reverse flow, check valves should be added to prevent reverse flow of fluid.
The sensor should be concentric with the pipeline, and the sealing gasket must not protrude into the pipeline. The sensor should no longer be at the high point of the pipeline, so as to prevent the gas accumulated in the pipeline (such as air mixed in when the flow is stopped) staying at the sensor, which is difficult to discharge and affect the measurement.
The pipes at the front and rear of the sensor should be supported firmly without vibration. For condensable fluids, heat insulation measures should be taken for the sensor and its front and rear pipes.
Transmission cables are usually two-core or three-core with shielded signal cables. The shielded signal cables should be grounded at the end of the display instrument (flow totalizer or flow calculation controller). The transmission path should not be parallel to the power supply line. Area where lines are concentrated.
Turbine flowmeter installation precautions
Article from:yibiaohui

TheTurbine flowmeter is one of the main products of the NOIKE. For more information, please visit the product page orZANKE staff.
主站蜘蛛池模板: 毛色毛片免费观看 | 天天久久综合 | 性欧美大战久久久久久久野外黑人 | 人人澡人人透人人爽 | 四房播播 四房播播 | 糖心vlog国产剧免费观看 | 国产成人精品久久免费动漫 | 羞羞答答APP安装以后在手机哪里 | 18禁用污直播下载 | 18禁无遮挡羞羞污污污污免费 | 毛片无码一区二区三区A片视频 | 午夜色大片在线观看 | 斯大林格勒战役免费高清观看 | 久久久久久久99精品免费观看 | 午夜A级理论片左线播放 | 日本成人免费在线观看 | 伊人久久波多野结衣中文字幕 | 99在线观看精品视频 | 成人网站色情WWW免费 | 女帝娜美罗宾群啪比赛里番acg | 波多野结衣在线影视 | 色欲天天婬色婬香视频综合网 | 97久久超碰中文字幕 | 美国三圾片在线观看 | 久久久久久久久亚洲 | 乱码视频午夜间在线观看 | 色婷婷精品免费视频 | 国精产品一二二区传媒公司 | 日韩在线不卡视频 | 色125综合| 成人深夜福利 | 黄色在线| 蜜桃视频无码区在线观看 | 亚洲永久精品AV在线观看 | 666夜色666夜色国产免费看 | 国产精品第1页在线播放 | 求av网址| 性欧美一区 | 我爱灰太狼全集 | av影音先锋影院男人站 | 日本在线观看网站 |