91视频网址入口-91视频污版网站-91视频污版下载-91视频污导航-91视频污污网站-91视频污污污

Welcome,Flow Switches,Shanghai ZanKe Automation Technology Co., Ltd Hotline:18001874240
Language: Chinese∷  English

Home> English Website common problem

How to calibrate flow switch

Time: 2025-02-19 01:02:04 Click:0


The calibration methods for flow switches mainly include the following steps:

  1. Power On: Connect the brown and black wires to a 24V DC power supply.

  2. Initial Testing: Turn on the water faucet and observe whether the display on the fire flow switch reaches 20%. When it reaches 20%, the red light will illuminate, and the output terminal will change from normally open to normally closed. After confirming that the test is functioning correctly and all outputs are normal, connect the blue and yellow wires of the output terminal to the reserved control wires of the main pump. Once the main pump displays normally, the initial testing process for the entire flow switch is complete.

  3. Parameter Setting: Set the relevant parameters of the flow switch according to fluid characteristics and application requirements, such as measurement range, sensitivity, alarm values, etc.

  4. Using Calibration Equipment: After setting the parameters, use a standard flowmeter and calibration equipment to calibrate the flow switch.

  5. Gradual Adjustment: During the testing process, gradually adjust the sensitivity and threshold values of the flow switch, observe its response, until the best measurement and control effect is achieved.

  6. Inspection and Verification: After calibration, conduct a flow test to verify whether the flow switch can accurately reflect the actual flow value. At the same time, check that the set value of the flow switch is not lower than the factory setting. By pressing the main lever several times, check if there is a "click" sound when the main lever returns. If not, rotate the adjustment screw clockwise until a "click" sound is heard when the lever returns.

微信圖片_20240904132331

In addition, during the entire calibration process, the following points should be noted:

  ? Follow the Instructions: When setting parameters and calibrating, carefully read the product manual to understand the specific steps and precautions.

  ? Avoid Arbitrary Changes: Do not arbitrarily change the already set parameters to avoid affecting the accuracy of the measurement data.

  ? Safety First: Pay attention to safety during calibration and testing to avoid accidents. If calibration needs to be performed under live conditions, it should be operated by professionals.

Different models and brands of flow switches may have different calibration methods and steps. Therefore, it is important to thoroughly understand the calibration requirements of the specific equipment before calibration.

no no
主站蜘蛛池模板: 91精品国产手机在线版 | 99视频在线观看免费视频 | 日本高清视频在线免费观看 | 秋霞精品 | 男同桌上课时狂揉我下面污文 | 欧美 国产 亚洲 卡通 综合 | 日韩欧美一及在线播放 | 亚洲国产乱 | 成人18在线视频播放 | 久久99久久99小草精品免视看 | 性一交一乱一伦一色一情孩交 | 黄图男在上女在下 | 日本v在线观看 | 国产成人AV三级在线影院 | 666夜色666夜色国产免费看 | 精品人妻无码一区二区三区蜜桃一 | 五月天婷婷免费视频观看 | 狠狠撸亚洲视频 | 国产精选 第1页-要看tv | 国产一级做a爰片久久毛片男 | 天天插天天干天天射 | 操亚洲美女 | 最近中文字幕高清字幕MV | 97九色| 亚洲天码中字 | 影视先锋男人无码在线 | 撕开胸罩胸奶头玩大胸动态图片 | 少妇饥渴偷公乱AV在线观看涩爱 | 最近免费更新中文在线观看 | 福利卡—卡二卡三卡四卡 | 美景之屋4在线未删减免费 美景之屋4在线 | 国产精品久久久久久久上海公司 | 无人视频免费观看免费直播 | 91精品国产亚洲爽啪在线观看 | 亚洲国产中文字幕 | 日韩A片无码毛片免费看久久 | 影音先锋av网站你懂得 | 国产精品免费一区二区三区四区 | 国产女人第一次做爰视频 | 日本午夜影院 | 老女老肥熟国产在线视频 |